top of page

TURNKEY PROJECT MANAGMENT

USO TOTAL SOLUTION offers full Turn-Key Project Management from project inception to final delivery.

 

Our TOTAL SOLUTION Package consists of:

 

  • Fully designed and integrated  engineering pacakage of all systems.

  • Supply and installation of the Joiner package consisting of:

  1. Insulation Package 

  2. Joiner Bulkhead and Ceiling System

  3. Bathroom Modules, Prefabricated or Knockdown

  4. Joiner doors,  A, B AND C-CLASS

  5. Furniture, Wood, Metal, Honeycomb 

  6. Decking Package including DMS Floating Floor System

  • Galley Equipment

  • Galley Stainless Steel Cabinets and Cupboards 

  • Laundry Equipment

  • Piping System

  • Electrical Package

  • HVAC Package

  • Windows and Portholes

  • Weathertight Doors

  • Watertight and QA watertight doors

  • Hatches and Manholes

  • Custom Fabricated Bridge Consoles

  • Chill Room (Cooler and Freezer), complete with Stainless Steel Shelving

  • Dumbwaiter 

  • Raised Floor System

 

With over 25 years of experience in all aspects of interior outfitting, USO has gained the core competenece and expertise to complete any type of interior project.  We have successfully delivered our Turn-Key services both in New Construction as well as major Refurbishments World Wide.   

Big or small, elegant or practical, new build or refurbishment, US Outfitters LLC has the expertise to meet your requirements.  From concept to final installation, our project managers oversee every detail of each job by working with customer, designers, draftsmen, shop builders and installers every step of the way.  Through ship surveys, establishing budgets and scope of work, creating project schedules, soliciting sub contractors, purchasing, supervising the build process, logistics and finally, install, we take care of everything so you don’t have to.

INTEGRATED SOLUTIONS FOR A PERFECT FIT

bottom of page